EZ Dock rental pontoons

Floating work platform during the dismantling of a GRP Catwalk for a client in Redbridge.

 

Sed a Eros Nec
Leo euismod eleifend sit amet ut nisl. Sed a eros nec leo euismod eleifend sit amet ut nisl.

 
 

And that's another nice project completed by Triangle ltd.
Well only half done actually, Takedown of the redbridge flyover GRP access walkway. We installed this walkway in 2017 but due to hydro demolition and repair works. It needed to be taken down and stored for 12 months before returning and putting it back up again.

During that year our crew are on 24/7 standby with structural supports should they be needed. We will be called out if any faults are found in the concrete pillars, which we need to support until properly repaired.